Reconstruction (construction) of the northern and southern breakwaters of Klaipeda State Seaport and the strengthening of part of the slope of the Curonian Spit
February 7, 2018 at 1:36 pm,
No comments
The most significant object of our company in year 2017.
Within these works 22 boreholes till 30 m depth
(from water surface) with core drilling method was made, as well as CPT and
DPSH testing in 22 points (with variable depth).